Solar Rooftop Victory Shoes
On December 31, 2024, the 1.9MWp solar rooftop project energized Phase 1.Overview
 Location
 Vu Thu Town, Thai Binh Province
 Scope of work: 
 EPC General Contractor
 Time: 
COD: 12/2024
 Investor: 
 Vietnam Victory Shoes Co., Ltd
We believe that the achievement of a total of 10,000 accident-free working hours and the completion of the transmission of power from the solar power generation system on December 31, 2024 is the result of good teamwork between the client (Victory Group), the EPC general contractor (NSN), and the developer (Total Energies).