Factory Rooftop
The rooftop solar installation project for the factory has a capacity of 1.25 WMdc.Overview
Location
Hoa Phu Industrial park, Vinh Long Province
Scope of work:
EPC General Contractor
Time:
COD: 09/2022
The project is not only an achievement in the green transition of the factory but also affirms the leading position in the field of construction of renewable energy projects of NSN, the EPC General Contractor of the project.