Solar Rooftop project at Dong Nai province
The rooftop solar installation project for the factory has a capacity of 3.5 MWdc.Overview
Location
Amanda Industrial Park, Dong Nai Province
Scope of work:
EPC General Contractor
Time:
COD: 12/2024
This rooftop solar project demonstrates NSN's capacity, professionalism, and reputation in the F&B industry. The passion and tireless work of NSN members enabled the project to overcome every challenge and be completed successfully.