Ham Phu 2 Solar Power Plant 49 MWp
Capacity: 49MWpElectricity Output: 76 million KWh
Overview
Location
Ham Thuan Bac District, Binh Thuan Province
Scope of work:
EPC General Contractor
Time:
COD: 21/04/2019
Investor:
Gia Lai Hydropower JSC
Ham Phu 2 plant was built on 54.2 hectares and is the second solar power plant implemented by NSN and Japan's Sharp Group. The plant was connected to the grid 6 days ahead of the committed schedule and put into commercial operation at the end of April 2019.